Pool Buying Guide
A practical order of decisions for a new pool project, rather than a single "how much does it cost" number that doesn't account for your actual lot.
1. Pool Type
Start with gunite vs. fiberglass (see the full comparison): gunite for a fully custom shape, fiberglass for a faster timeline and lower long-term maintenance.
2. Must-Have Features
A tanning ledge, raised spa, negative edge, or water feature each change both cost and construction sequence, prioritize before the first design meeting so the site evaluation can account for them.
3. Budget Range
See Financing for how that gets funded, and the Resources below for a realistic cost breakdown.
4. Site Evaluation
Because each Memorial Village is its own municipality, pool permits are pulled through that specific village rather than one shared county office, and that permitting path is confirmed as part of design planning. Memorial-area lots also tend to carry mature tree canopy, so tree-preservation and root-protection zones are part of the site evaluation before a pool footprint is set.
5. Permitting and HOA Review
Confirmed during design, not after a contract is signed, see Areas We Serve for neighborhood-specific notes.
Next Steps
Pool Glossary
Plain-language definitions for construction, equipment, and chemistry terms.
Maintenance Checklist
A printable-style checklist for ongoing pool care.
Pool Financing
Financing options for pool construction.
Start With a Free Quote
Tell us about your project and we’ll follow up within one business day.